SHUTTLE
PROCESSING
(Before Flight Activities Rarely Been By The General Public)
External tank arrives by barge from MS
Vertical assembly building
Removing external tank from carrier
External tank enter VAB
External tank in VAB
Preparing to lift the tank to vertical
Lifting tank
Solid rockets are attached
Engines are attached to solids
Engines are attached to the shuttle in the shuttle processing facility
Shuttle is sling ready for lift in VAB
Shuttle has been moved to VAB and will be attached to external tank
Shuttle is attached
Payload preparation room (PPR)
Cargo package for ISS
New module for ISS
Payload ready to be moved to the launch pad
Payload carrier leaves PPR
Payload being moved to launch pad
Lifting payload into position for insertion into Discovery when it arrives at the pad
Shuttle Discovery leaves VAB
Shuttle and crawler
Crawler control
Discovery arrives at pad
Discovery ready for launch
We have lift off